Skip to main content
SmartEnergyPH
Solar Energy

Understanding Solar Net Metering in the Philippines

How Philippine net metering works: the legal basis, the 100 kW limit, how exports are credited, the 2025–2026 rule changes and the Meralco application steps.

By SmartEnergyPH Editorial Published 10 min read

Checked against the sources listed below. How we research.

Key takeaways

  • Net metering lets distribution utility customers with a renewable energy system of up to 100 kW export surplus power and receive peso credits on their bills.
  • Exports are credited at your utility's generation-cost-based rate (the blended generation cost, excluding other generation adjustments), not the full retail rate. The rate changes monthly and differs by utility.
  • Under the ERC's 2025 amended rules, credits can be banked and rolled over to later bills and can transfer to a new property owner. Meralco says credits cannot be converted to cash.
  • Recent changes include optional REC meters, a ₱3,000 cap on residential meter replacement charges, no mandatory notarization of the agreement, and shorter permit and processing timelines in 2026.
  • At Meralco the process runs from application through a technical study, inspection, paperwork, energization and filing with the ERC. Other utilities and cooperatives use their own forms.
On this page
  1. The legal basis for net metering
  2. Who can apply
  3. How exported energy is credited
  4. Metering: bi-directional and REC meters
  5. How to apply with Meralco
  6. If you’re not a Meralco customer
  7. Common mistakes to avoid
  8. The bottom line

Net metering lets a household or business that generates its own renewable electricity, usually from rooftop solar, send surplus power to its distribution utility and get peso credits on its electricity bill. In the Philippines it is open to customers in good credit standing with a renewable energy system of up to 100 kW, with or without batteries.

The key detail most people miss: exported energy is not credited at the full retail rate you pay. Your utility credits each exported kWh at its monthly generation charge based on its blended generation cost, excluding other generation adjustments. That rate differs by utility and changes every month, so no fixed national “export rate” exists. Credits reduce your bill and roll over to later months, but you can’t cash them out.

This guide covers the legal basis, the recent rule changes, how credits are calculated, the metering, and how to apply with Meralco or another utility.

Republic Act No. 9513 (Renewable Energy Act of 2008)

The Renewable Energy Act introduced net metering. Section 4 defines it as a system in which a distribution grid user with a two-way connection “is only charged for his net electricity consumption and is credited for any overall contribution to the electricity grid.”

Section 10 requires distribution utilities, “subject to technical considerations and without discrimination and upon request,” to enter into net-metering agreements with qualified end-users who install renewable energy systems. It directed the Energy Regulatory Commission (ERC) to set the interconnection standards, pricing methodology and commercial arrangements.

The ERC net-metering rules and their amendments

Year Issuance What it did
2013 ERC Resolution No. 09, Series of 2013 Adopted the Rules Enabling the Net-Metering Program for Renewable Energy. The DOE says it was adopted on 27 May 2013 and took effect on 24 July 2013.
2019 ERC Resolution No. 06, Series of 2019 Amended the 2013 rules.
2024 DOE Department Circular DC2024-08-0025 According to a law-firm summary, removed the one-year cap on carrying over credits and set conditions for dropping the REC meter requirement. It amends DOE circular DC2020-10-0022.
2025 ERC Resolution No. 15, Series of 2025 (27 August 2025) Adopted the 2025 Amended Rules: banking and rollover of credits, transfer to a new owner, optional REC meters, and more disclosure by utilities.
2025 ERC advisory (22 September 2025) Simplified documents, made notarization of the agreement optional, allowed e-signatures, capped residential meter replacement charges at ₱3,000, and made testing and commissioning free.
2026 Joint Memorandum Circular No. 001, s. 2026 (DILG, DOE, DPWH) Set LGU deadlines: electrical permit within 3 working days, Certificate of Final Electrical Inspection (CFEI) within 7 working days, with deemed approval if the LGU doesn’t act.
2026 DOE directive (1 April 2026) Under the national energy emergency (Executive Order No. 110, s. 2026), required utilities and electric cooperatives to finish processing within 10 working days, down from 20.

Rules are changing quickly. In July 2026 the ERC proposed further changes, including a 10-working-day interconnection timeline in the rules themselves, automatic approval if a utility is late installing the meter, another look at residential bi-directional meter costs, and exempting small systems from technical studies. As of this writing these were proposals, not final rules. The DOE’s 10-working-day directive is tied to the national energy emergency. Check the current rules with your distribution utility or the ERC before you rely on any timeline.

Who can apply

The DOE and Meralco describe these basic eligibility conditions:

  • You are a customer of a distribution utility (a private utility such as Meralco, Visayan Electric or Davao Light, or an electric cooperative).
  • Your renewable energy system is 100 kW or smaller. Meralco states this as 100 kWp for solar PV.
  • At Meralco, the account must be in the applicant’s name and in good standing, with no unpaid balance.
  • The system can include battery storage.

Systems larger than 100 kW fall under the ERC’s separate rules for distributed energy resources (DER), not the residential net-metering program. They are outside the scope of this guide.

Your local grid can limit how much you connect. Meralco publishes indicative hosting capacities for single-phase distribution transformers, for example about 7 kW of solar on a 10 kVA or 15 kVA transformer and 10 kW on a 25 kVA transformer. The final figure depends on conditions on your line. Meralco assesses this in its Distribution Impact Study. If your system is larger than what the transformer can host, upgrades may be needed.

How exported energy is credited

Meralco explains the bill calculation this way:

Net amount payable = amount for imported energy
                     − amount for exported energy
                     − any credit carried over from the previous month

Where:

Amount for exported energy = exported kWh × that month's export credit rate (₱/kWh)
Export credit rate         = the utility's generation charge based on its blended
                             generation cost, excluding other generation adjustments

A few points follow from this:

  • Imports are billed normally. Energy you draw from the grid is charged at your full applicable rates: generation, transmission, distribution, taxes and so on.
  • Exports earn less per kWh than imports cost. The export credit covers roughly the generation part of the bill, not the whole retail rate. So each kWh of solar you use yourself is usually worth more than each kWh you export.
  • Credits roll over. The ERC’s 2025 amended rules allow credits to be banked and applied to current and future bills. Meralco says unused credits carry over but cannot be converted to cash.
  • Credits can move with the property. Under the 2025 rules, credits can be transferred to a new owner, subject to conditions such as a conforme letter from the original owner.
  • Subsidies use total consumption. Meralco notes that eligibility for subsidies such as the lifeline and senior citizen discounts is based on total consumption, including the solar energy you use directly.

To find your export credit rate, look for the export kWh and credit lines on your net-metering bill, or check your utility’s published monthly rates.

Worked example: how the credit shows up on a bill

Hypothetical worked example (estimate). These numbers are illustrations, not real tariffs. The import rate uses SmartEnergyPH’s reference figure: Meralco’s announced overall rate for a typical 200 kWh household in October 2026 (₱15.0615/kWh per The Philippine Star, rounded to ₱15.06). The export credit of ₱7.50/kWh is an assumed figure, not Meralco’s actual generation charge. Real bills itemise charges separately and have fixed components, so treat this as a simplification.

Month A: you import more than you export

  • Imported from the grid: 250 kWh × ₱15.06 = ₱3,765.00
  • Exported to the grid: 120 kWh × ₱7.50 = ₱900.00
  • Net amount payable: ₱3,765.00 − ₱900.00 = ₱2,865.00

Month B: a sunny month with low use

  • Imported: 60 kWh × ₱15.06 = ₱903.60
  • Exported: 150 kWh × ₱7.50 = ₱1,125.00
  • The credit exceeds the import amount by ₱221.40. That balance carries over to Month C. It is not paid out in cash.

Why self-consumption matters: in this example, a kWh you use yourself avoids about ₱15.06, while a kWh you export earns ₱7.50. Moving a load such as laundry, water pumping or pre-cooling with an inverter aircon into sunny hours could increase the value of the same solar output.

Use the solar savings calculator to try your own numbers, including different shares of self-consumed versus exported solar, and the solar payback calculator to see how the export rate affects payback. If you’re unsure how your bill is built up, see how to calculate your electricity bill.

Metering: bi-directional and REC meters

Bi-directional meter. Required for net metering. It records imported and exported energy separately. Meralco warns that without one, and without enrolling in net metering, your solar output may be recorded as imported energy and raise your bill. The utility provides and installs the meter. If your existing meter can’t measure both directions, Meralco says the charge for the difference in meter cost does not exceed ₱3,000 for residential customers, citing an ERC advisory dated 22 September 2025.

REC meter. A Renewable Energy Certificate (REC) meter measures how much electricity your system generates, as opposed to how much you export. Under the 2025 amended rules it is optional. If you waive it, the utility estimates your generation using an ERC-prescribed formula. At Meralco, waiving it requires a signed and notarized affidavit and waiver.

Why generation is measured at all: RECs and the RPS

Section 10 of RA 9513 gives the distribution utility the right to any Renewable Energy Certificate (REC) from a net-metering arrangement. The utility can use these certificates to meet its obligations under the Renewable Portfolio Standards (RPS). The Act defines the RPS as a market-based policy that requires electricity suppliers to source an agreed portion of their energy supply from eligible renewable energy resources. This is why your generation is either metered or, if you waive the REC meter, estimated with the ERC formula for RPS purposes. You don’t sell or receive these certificates yourself under net metering.

How to apply with Meralco

Meralco’s net-metering page sets out six stages. Your installer often handles much of the paperwork, but the account holder remains the applicant.

  1. Application. Submit the Net-Metering Application Form for Solar PV Systems at a Meralco Business Center (walk-in or by appointment). Business customers can apply by email through their account managers. Systems with several panel, inverter or battery models need an Annex Sheet. A representative needs a valid ID and an authorization. Meralco checks eligibility and, if you won’t install a REC meter, discusses the setup and billing implications.
  2. Evaluation. Meralco runs a Distribution Impact Study to confirm the grid can safely take your system. For systems up to 7 kWp this uses engineering computations. Larger systems may need power quality measurements and can take longer. If upgrades are needed, a Distribution Asset Study follows. Meralco also issues a yellow card, which your LGU may require before issuing the CFEI.
  3. Inspection. Meralco inspects your service entrance against its standards. Once it complies, Meralco issues the Net-Metering Agreement and Fixed Asset Boundary Document for signature.
  4. Completion. Submit the LGU’s Certificate of Final Electrical Inspection (CFEI), the signed agreement and boundary document (notarization not mandatory, e-signatures allowed), the notarized affidavit and waiver if you skip the REC meter, and any meter-cost charge. You’ll also pay the ₱1,500 ERC Certificate of Compliance application fee.
  5. Energization and commissioning. Meralco installs the bi-directional meter and tests the system. The tests include checking that it disconnects within 2 seconds during an outage and reconnects only 10 minutes after power returns. A special meter reading marks the start of net-metering service.
  6. Transmittal to the ERC. Meralco files your documents with the ERC, which issues the Certificate of Compliance (COC) that completes the process.

Meralco lists its hotline as (02) 16211 for residential customers and 16210 for business customers.

Tip. Coordinate with your LGU early. Meralco notes that CFEI requirements vary by LGU, and your city or municipality may ask for Meralco’s yellow card before issuing the CFEI. Under JMC No. 001, s. 2026, LGUs are expected to act on electrical permits within 3 working days and CFEIs within 7 working days.

If you’re not a Meralco customer

The ERC net-metering rules apply to all distribution utilities, including electric cooperatives, but each one runs its own application process, forms and offices. The 2025 amended rules require utilities to publish their net-metering procedures and application forms on their websites. Visayan Electric and Davao Light, for example, posted notices about the ERC’s September 2025 advisory along with their own contact details. Start with your utility’s website or customer service office, ask for the net-metering application checklist, and ask how long each step currently takes. We’ve collected the published steps, documents and fees for Meralco, Visayan Electric, Davao Light and other utilities and cooperatives in net metering by electric company.

Common mistakes to avoid

  • Exporting before you’re approved. Until the bi-directional meter is installed, exported solar may be recorded as consumption.
  • Sizing for export. Because exports earn less than imports cost, a system sized well beyond your daytime use may pay back more slowly than expected. See how many solar panels a Philippine home needs.
  • Ignoring transformer capacity. Ask the installer to check with the utility before finalising system size.
  • Losing paperwork. Keep copies of your agreement, CFEI, COC and meter details. You’ll need them if you sell the property and transfer credits.

The bottom line

Net metering turns your surplus solar into bill credits, but those credits are valued at your utility’s generation-cost-based rate, not the full retail price, so the biggest savings usually come from using solar power yourself. The legal basis is RA 9513 and the ERC’s net-metering rules, most recently amended in 2025, with 2026 measures aimed at faster permits and processing. Timelines and fees are still being revised, so confirm the current requirements with your distribution utility before you sign an installation contract. Then follow its steps in order. For the full journey from quote to switch-on, see our residential solar installation guide, and compare installers on our compare solar quotes page.

Run your own numbers

Frequently asked questions

Does my utility pay me cash for the solar power I export?
No. Exports earn peso credits that are deducted from your electricity bill. Meralco says unused credits carry over to future bills but cannot be converted to cash.
How much is each exported kWh worth?
There is no fixed national rate. Exports are valued at your distribution utility's monthly generation charge based on its blended generation cost, excluding other generation adjustments. This changes every month and is lower than the full retail rate you pay for imported power.
Can I join net metering if my solar system has batteries?
Yes. The Department of Energy describes the program as covering renewable energy systems with or without battery storage, up to 100 kW.
How long does the net-metering application take?
The ERC's amended rules set a 20-working-day interconnection period once permits are in place. In April 2026, the DOE directed utilities and electric cooperatives to finish processing within 10 working days for the duration of the national energy emergency. Actual time also depends on LGU permits and any grid upgrades, so ask your utility for its current timeline.
What does net metering cost to apply for?
At Meralco, the ERC Certificate of Compliance application fee is ₱1,500. A charge for replacing an old meter with a bi-directional meter is capped at ₱3,000 for residential customers. The ERC says testing and commissioning should be free. LGU permit fees are separate and vary.
What happens to my credits if I sell my house?
Under the ERC's 2025 amended net-metering rules, credits can be transferred to the new owner, subject to conditions such as a conforme letter from the original owner.

Sources

We link to primary sources wherever possible. Rates, rules and prices change — check the latest version with the publisher.

  1. Republic Act No. 9513 — Renewable Energy Act of 2008 (opens in a new tab) — The LawPhil Project. Accessed October 26, 2026.
  2. The 5 Ws of Net-Metering (DOE primer, September 2022) (opens in a new tab) — Department of Energy. Accessed October 26, 2026.
  3. ERC amends net-metering program rules (opens in a new tab) — GMA News. Accessed October 26, 2026.
  4. The Energy Regulatory Commission Amends the Net-Metering Rules for Renewable Energy (opens in a new tab) — Ocampo & Suralvo Law Offices. Accessed October 26, 2026.
  5. Why Apply for Net-Metering (opens in a new tab) — Meralco. Accessed October 26, 2026.
  6. Application Process (Net-Metering) (opens in a new tab) — Meralco. Accessed October 26, 2026.
  7. Net Metering (Frequently Asked Questions) (opens in a new tab) — Meralco. Accessed October 26, 2026.
  8. ERC Advisory for On-Grid DUs in relation to Net-Metering program (opens in a new tab) — Davao Light and Power Company. Accessed October 26, 2026.
  9. ERC Advisory on Net Metering (opens in a new tab) — Visayan Electric Company. Accessed October 26, 2026.
  10. DOE Eliminates One-Year Cap on Net-Metering Credit Roll-Over and Removes Renewable Energy Certificate Meter Requirement (opens in a new tab) — Cruz Marcelo & Tenefrancia. Accessed October 26, 2026.
  11. DILG to LGUs: Fast-track net-metering applications to boost renewal energy adoption (opens in a new tab) — Department of the Interior and Local Government Region IV-A. Accessed October 26, 2026.
  12. DOE reduces approval time for net-metering applications (opens in a new tab) — GMA News. Accessed October 26, 2026.
  13. Philippines proposes transmission grid reforms, updates to net-metering (opens in a new tab) — pv magazine. Accessed October 26, 2026.
  14. Philippines increases net-metering size limit for renewables to 1 MW (opens in a new tab) — pv magazine. Accessed October 26, 2026.