Residential Solar Installation Guide: From Quote to Switch-On

A step-by-step guide to installing home solar in the Philippines: sizing, roof checks, comparing quotes, installer credentials, permits, net metering and upkeep.

By SmartEnergyPH Editorial Published 11 min read

Checked against the sources listed below. How we research.

Key takeaways

  • Start with 12 months of electricity bills and a clear goal (lower bills, brownout backup, or both). These decide the system size and type.
  • Get at least three written quotes that list exact equipment models, kWp, the basis for the estimated generation, warranties, inclusions, timeline and payment terms.
  • Under RA 7920, electrical plans must be signed and sealed by a Professional Electrical Engineer, and the work must be done under licensed supervision. You can check a licence on the PRC's online verification site.
  • You need an LGU electrical permit and, after installation, a Certificate of Final Electrical Inspection (CFEI). If you'll export power, you also need your distribution utility's net-metering approval and a bi-directional meter.
  • After switch-on, compare monitored output against the quote, keep all documents, and plan for typhoon checks and routine maintenance.
On this page
  1. Step 1: Understand how much electricity you use, and when
  2. Step 2: Decide what you want the system to do
  3. Step 3: Site, roof and shade assessment
  4. Step 4: Get and compare at least three written quotes
  5. Step 5: Check the installer’s credentials
  6. Step 6: Sign a clear contract
  7. Step 7: Permits from your LGU
  8. Step 8: Apply for net metering with your distribution utility
  9. Step 9: Installation, inspection and commissioning
  10. Step 10: Monitoring, maintenance and typhoon season
  11. The bottom line

A home solar project in the Philippines usually runs through ten stages: work out your electricity use, choose a system type, have your roof assessed, compare written quotes, check the installer’s credentials, sign a clear contract, secure LGU permits, apply for net metering with your distribution utility, install and commission the system, then monitor and maintain it. The paperwork has to happen in the right order, and a few documents only exist once others are done. A good installer manages most of this, but you should know what each step involves so you can spot gaps.

This guide walks through each stage, what to ask, and which documents to keep. It doesn’t replace advice from a licensed electrical engineer who has seen your property.

Step 1: Understand how much electricity you use, and when

Collect your last 12 months of bills and note the kWh (kilowatt-hours) used each month. One month can mislead you: use in the hot months of March to May is often higher than in the rainy season. Then think about when you use power. Solar produces during daylight, so a household that runs fans, a refrigerator, computers and an inverter aircon during the day can use more of its solar output directly than one that is empty until evening.

Useful tools:

A simple sizing check you can compare against installers’ proposals:

Approximate system size (kWp) ≈ daytime kWh you want to cover per day ÷ expected kWh per kWp per day

The “kWh per kWp per day” figure (specific yield) depends on your location, roof direction, tilt, shading and system losses. Ask each installer which figure they used and where it came from.

Step 2: Decide what you want the system to do

Your goal decides the system type:

  • Lower daytime bills on a stable grid: an on-grid (grid-tied) system.
  • Keep essentials running in brownouts: a hybrid system with a battery and a backup sub-panel.
  • No reliable grid at all: an off-grid system.

Standard on-grid systems shut down during outages for safety reasons. Our comparison of on-grid, hybrid and off-grid solar explains the trade-offs. Make this decision before you collect quotes so all installers price the same thing.

Step 3: Site, roof and shade assessment

A proper site visit should cover:

  • Roof direction and tilt. Which roof faces get the most sun, and how much usable area is free of vents, water tanks and edges.
  • Shade. Trees, neighbouring buildings, water tanks and antennas. Even partial shade at certain hours can cut output. Ask how the installer assessed shade and whether the design uses optimisers or microinverters where shading is unavoidable.
  • Roof condition and age. If the roof will need repair or replacement in the next few years, it is usually cheaper to do it before the panels go on.
  • Roof structure. Whether the rafters or purlins and the roofing material can carry the panels and mounting safely, including wind uplift during typhoons (see Step 10).
  • Electrical service. The condition of your service entrance, main panel and grounding, and where the inverter, isolators and any battery will go. Pick a shaded, ventilated spot above possible flood levels.
  • Grid capacity. Your local transformer can limit how much solar you connect. Meralco, for example, publishes indicative hosting capacities for single-phase transformers. It lists about 7 kW for a 10 kVA or 15 kVA transformer and 10 kW for a 25 kVA transformer, with the final figure set by its own study. A careful installer raises this before finalising your system size.

Step 4: Get and compare at least three written quotes

Verbal estimates and one-line Facebook messages are hard to compare and hard to enforce. Ask for written, itemised quotes from at least three installers. Each quote should include:

Item What to look for
System size Total panel capacity in kWp and the number of panels
Panels Brand, exact model, wattage; datasheet attached
Inverter(s) Brand, exact model, rated AC output; datasheet attached
Battery (if any) Brand, model, usable kWh, chemistry; datasheet attached
Mounting Brand/type of rails and roof attachments, and how they are fixed to your roof
Protection and wiring DC and AC isolators, breakers, surge protection, cable sizes, grounding
Estimated generation kWh per year or month, and the basis: data source, tilt/orientation, shading and loss assumptions
Warranties Separate product and performance warranties for panels; inverter and battery warranties; the installer’s workmanship warranty; who handles claims
Inclusions Permits, engineering plans, net-metering application, monitoring setup, after-sales visits
Exclusions Roof repairs, electrical upgrades, utility charges, meter costs
Timeline Expected dates for permits, installation and commissioning
Payment terms Deposit, milestone payments, retention until commissioning

To compare prices fairly, work out the cost per kWp for each quote:

Price per kWp (₱/kWp) = total quoted price (₱) ÷ system size (kWp)

Worked example (estimate). A hypothetical quote of ₱300,000 for a 5.0 kWp system works out to ₱300,000 ÷ 5.0 = ₱60,000 per kWp. A second hypothetical quote of ₱330,000 for 6.0 kWp works out to ₱55,000 per kWp. The second quote is cheaper per kWp, but you would still need to compare equipment, warranties and inclusions before deciding. These figures are made up for illustration and are not market prices.

A lower price per kWp is not automatically better. Check whether one quote leaves out permits, the net-metering application or a proper mounting system. For typical cost ranges, see solar panel prices and installation costs. Plug each quote’s price and estimated generation into the solar payback calculator to compare them on the same assumptions. Our compare solar quotes page has a printable checklist.

Tip. Be wary of any quote that promises a specific bill amount or “zero bill” without showing its assumptions. Your savings depend on your actual use, the share of solar you consume yourself, your utility’s rates and its export credit rate, all of which change.

Step 5: Check the installer’s credentials

Who may sign plans and supervise the work

The New Electrical Engineering Law, Republic Act No. 7920, sets clear rules. Section 31 gives a Professional Electrical Engineer (PEE) the sole authority to seal electrical plans. Section 34 says no installation should be undertaken unless the plans and specifications have been prepared by or under the responsible charge of, and signed and sealed by, a PEE, and a construction permit has been secured first. The work must follow the Philippine Electrical Code and be done under the supervision of a PEE, a Registered Electrical Engineer (REE) or a Registered Master Electrician (RME), as the case may be.

In practice, ask the installer:

  • Who is the PEE who will sign and seal your plans? Get their full name and PRC licence number.
  • Who will supervise the work on site, and what is their licence?

You can check a professional licence on the PRC’s online verification portal (LERIS) at verification.prc.gov.ph.

Other checks

  • DOE Solar PV Installer Registry. The DOE publishes an official registry of solar PV installers, updated as of 31 January 2026 at the time of writing. The registry itself says it is a reference for government entities and that the DOE does not endorse any listed installer. Being listed is a useful sign. Not being listed doesn’t by itself rule out an installer for a home project.
  • Technician training. TESDA offers a Photovoltaic Systems Installation NC II qualification. You can ask whether the installation crew holds it.
  • Track record. Ask for addresses or photos of similar residential jobs, ideally ones that have been through a typhoon season, and for references you can contact.
  • Business registration and after-sales support. Confirm the company’s registered business name and address, and who you call when the inverter shows a fault.

Step 6: Sign a clear contract

The contract should repeat everything from the quote: equipment models, kWp, price, inclusions and exclusions, timeline, warranties and payment schedule. It should also say who is responsible for:

  • LGU permits and the signed and sealed plans
  • the net-metering application with your distribution utility
  • what happens if the utility’s study limits your system size or requires upgrades
  • roof leaks caused by the installation
  • removing and reinstalling panels if the roof needs repair later

Payments tied to milestones (for example: deposit, equipment delivery, completed installation, successful commissioning) spread the risk between you and the installer.

Step 7: Permits from your LGU

You need an electrical permit from your city or municipality before installation, based on plans signed and sealed by a PEE. After installation, the LGU inspects the work and issues a Certificate of Final Electrical Inspection (CFEI), which your utility needs before it will energize a net-metered system.

Under Joint Memorandum Circular No. 001, s. 2026, issued by the DILG, DOE and DPWH, LGUs should process electrical permits for net-metering installations within 3 working days and issue CFEIs within 7 working days. The circular also sets a “no additional requirements” policy and deemed approval if the LGU fails to act in time.

Check local requirements. Documentary requirements and fees vary by LGU, and some may ask for structural documents for roof-mounted equipment. Ask your local building official what is needed for your property. Meralco also notes that your LGU may ask for Meralco’s “yellow card” before issuing the CFEI, so start the utility application early.

Step 8: Apply for net metering with your distribution utility

If your system will export power, apply for net metering. Meralco warns that without a bi-directional meter, exported solar can be recorded as energy you imported. If you won’t export, Meralco offers a Zero Export arrangement instead. Check what your own utility offers.

At Meralco, the process runs through six stages: application, evaluation (a Distribution Impact Study), inspection of your service entrance, completion of documents and fees (including the CFEI and the ₱1,500 ERC Certificate of Compliance application fee), energization and commissioning, and filing with the ERC. Electric cooperatives and other utilities run their own versions. The DOE directed utilities and electric cooperatives in April 2026 to complete net-metering processing within 10 working days while the national energy emergency lasts.

Our net metering guide explains each step, how export credits are calculated, and the 2025–2026 rule changes.

Step 9: Installation, inspection and commissioning

A typical residential installation involves fixing roof attachments and rails, mounting the panels, running DC cables to the inverter, installing isolators, breakers and surge protection, connecting to your main panel, and setting up monitoring. Hybrid systems add the battery and a backup sub-panel.

Safety. Solar panels produce DC voltage whenever light falls on them, even when the inverter is off. Don’t open junction boxes, unplug connectors or climb onto the roof yourself. Keep children away from the work area, and make sure the installer leaves clear labels and a written shutdown procedure.

After installation:

  1. LGU inspection leads to the CFEI.
  2. Utility testing and commissioning. Meralco’s commissioning tests include checking that the system disconnects within 2 seconds during an outage and reconnects only 10 minutes after power returns. Davao Light’s notice of the ERC’s September 2025 advisory says testing and commissioning are free and that any bi-directional meter fee is capped at ₱3,000.
  3. Meter installation and start date. At Meralco, a special meter reading marks the start of net-metering service.

Documents to collect at handover

  • As-built single-line diagram and layout, signed and sealed
  • Datasheets and warranty certificates for panels, inverter, battery and mounting
  • The installer’s workmanship warranty, in writing
  • Electrical permit, CFEI, net-metering agreement and, later, the ERC Certificate of Compliance
  • Monitoring app login and the installer’s support contact
  • A written shutdown and restart procedure

Step 10: Monitoring, maintenance and typhoon season

Monitoring

Most inverters come with an app or web portal. Each month, compare actual generation against the estimate in your quote, allowing for weather. Output in the rainy-season months is usually lower than in the dry season. A sudden drop on a clear day can mean shading from a growing tree, a tripped breaker, a faulty panel or an inverter error. Report it to your installer.

Routine maintenance

  • Cleaning. Dust, ash and bird droppings reduce output. Follow the panel maker’s cleaning instructions, and use a professional if the roof is high or steep. Never walk on panels.
  • Visual checks. Look from the ground for loose panels, damaged cables or signs of water entry at roof penetrations.
  • Inverter area. Keep it ventilated and free of clutter. Watch for error codes.
  • Periodic professional inspection. Agree in the contract how often the installer will check connections, mounting bolts and protection devices.

Typhoon considerations

Typhoons are the main structural risk for rooftop solar here. Wind can lift panels and rails, especially near roof edges and corners.

  • Design. Ask how the mounting was designed for wind loads at your location. The National Structural Code of the Philippines sets design wind requirements, and a licensed civil or structural engineer can check the roof and attachments against them.
  • Equipment ratings. Panel datasheets and installation manuals state tested mechanical load ratings and the approved clamping zones. Check that the installer follows them.
  • Fixing into structure. Attachments should be fixed into rafters or purlins, not just roof sheeting, and sealed against leaks.
  • Before a typhoon. Follow your installer’s written advice. Don’t climb onto the roof in high winds.
  • After a typhoon. Inspect from the ground. If panels, cables or the inverter are damaged, or anything got wet, switch off using the documented shutdown procedure and call the installer. Don’t touch damaged equipment.
  • Insurance. Ask your home insurer whether the solar system is covered for typhoon and flood damage, and tell them about the installation.

The bottom line

A smooth installation comes down to good preparation and paperwork. Size the system from your actual bills and goals, have the roof and grid capacity checked, and compare at least three itemised written quotes. Confirm that a Professional Electrical Engineer will sign and seal the plans, and secure the LGU permits and CFEI. If you’ll export power, follow your utility’s net-metering steps in order. After switch-on, keep every document, track your output against the estimate, and plan for typhoon season. When you’re ready, use our compare solar quotes page to organise the quotes you collect.

Run your own numbers

Frequently asked questions

Who is allowed to sign the electrical plans for a home solar system?
Under Section 34 of RA 7920 (the New Electrical Engineering Law), electrical plans and specifications must be prepared by or under the responsible charge of, and signed and sealed by, a Professional Electrical Engineer (PEE). The installation itself must be supervised by a PEE, a Registered Electrical Engineer or a Registered Master Electrician, as the case may be.
Do I need a permit for a small rooftop solar system?
Yes. RA 7920 says an electrical installation should not proceed unless a construction permit is secured first, and your LGU issues the electrical permit and, after inspection, the Certificate of Final Electrical Inspection. Some LGUs may ask for additional documents, so check with your local building official.
How long does it take from signing a contract to switch-on?
It varies with equipment availability, LGU permits and the utility's process. Under JMC No. 001, s. 2026, LGUs should act on electrical permits within 3 working days and CFEIs within 7 working days. The DOE directed utilities in April 2026 to finish net-metering processing within 10 working days during the national energy emergency. Ask each installer for a written timeline.
Is there an official list of solar installers?
The DOE publishes an Official DOE Solar PV Installer Registry. Its own note says it is a reference for government entities and that the DOE does not endorse any listed installer, so treat it as one check among several, not as a guarantee of quality.
Should I pay the full amount upfront?
Paying everything before work starts puts all the risk on you. Many buyers prefer staged payments tied to milestones such as equipment delivery, completed installation and successful commissioning. Whatever you agree, put it in the written contract.

Sources

We link to primary sources wherever possible. Rates, rules and prices change — check the latest version with the publisher.

  1. Republic Act No. 7920 — New Electrical Engineering Law (opens in a new tab) — The LawPhil Project. Accessed October 26, 2026.
  2. LERIS (online licence verification) (opens in a new tab) — Professional Regulation Commission. Accessed October 26, 2026.
  3. Official DOE Solar PV Installer Registry (updated as of Jan 31, 2026) (opens in a new tab) — Department of Energy. Accessed October 26, 2026.
  4. Photovoltaic Systems Installation NC II (course listing) (opens in a new tab) — TESDA Online Program. Accessed October 26, 2026.
  5. Application Process (Net-Metering) (opens in a new tab) — Meralco. Accessed October 26, 2026.
  6. Net Metering (Frequently Asked Questions) (opens in a new tab) — Meralco. Accessed October 26, 2026.
  7. DILG to LGUs: Fast-track net-metering applications to boost renewal energy adoption (opens in a new tab) — Department of the Interior and Local Government Region IV-A. Accessed October 26, 2026.
  8. DOE reduces approval time for net-metering applications (opens in a new tab) — GMA News. Accessed October 26, 2026.
  9. ERC Advisory for On-Grid DUs in relation to Net-Metering program (opens in a new tab) — Davao Light and Power Company. Accessed October 26, 2026.