Net metering · Electric cooperative
NORECO II net metering: how to apply
Negros Oriental II Electric Cooperative. Here’s NORECO II’s net-metering process, documents and fees, from its own published guide.
Checked October 27, 2026. Rules and fees change; confirm with NORECO II before you apply.
At a glance
- How to apply
- Submit a letter of intent addressed to the General Manager, Atty. Fe Marie Dicen Tagle, with the listed documents.
- ERC fee
- ₱1,500.00
- Meter replacement
- Capped at ₱3,000 for residential customers (ERC)
- Processing time
- 20 working days once permits are in place (ERC); 10 working days during the energy emergency (DOE, April 2026)
Steps to apply with NORECO II
- 1 Application Submit the requirements listed below.
- 2 Evaluation NORECO II does a technical and non-technical review, including a Distribution Impact Study. If upgrades are needed, a Distribution Asset Study follows, and upgrade fees depend on that study.
- 3 Inspection NORECO II inspects your installation against its technical standards and specifies the kWh meter to be used.
- 4 Completion Submit the documents for the ERC Certificate of Compliance and pay the fees.
- 5 Energization Your system is energized.
Requirements NORECO II lists
- Letter of intent addressed to the General Manager
- Certificate of Good Credit Standing (existing customers)
- Application form
- Electrical plan approved and signed and sealed by a Professional Electrical Engineer
- RE facility interconnection set-up signed and sealed by a Professional Electrical Engineer
- Approved electrical permit
- Certificate of Final Electrical Inspection and Completion
- Photocopy of a valid ID
- Location map
- Copy of data from testing and commissioning
- Product specifications of the inverter and solar panels
- Relevant standard planning data
- Fixed Asset Boundary Document
- At completion: ERC Forms 1 and 2 (2 copies), notarized Net Metering Agreement (5 copies), and a NORECO II certification that you are technically compliant
The ERC’s September 2025 advisory says utilities may only require the application form, the CFEI from your LGU, the amended net-metering agreement and the ERC fee. If an item above isn’t on that list, ask NORECO II whether it’s still required.
Fees
| Fee | Amount |
|---|---|
| ERC Certificate of Compliance fee (manager's check payable to the ERC) | ₱1,500.00 |
LGU permit fees (electrical permit, CFEI) are separate and vary by city or municipality.
How long it takes
- 20 working days. Under the ERC’s 2025 amended rules, the utility has 20 working days to connect you once your permits are in place. (Ocampo & Suralvo Law Offices)
- 10 working days during the energy emergency. In April 2026 the DOE directed utilities and cooperatives to finish processing within 10 working days while the national energy emergency (EO 110, s. 2026) is in force. Ask your utility whether this still applies. (GMA News)
- Faster LGU permits. Under Joint Memorandum Circular No. 001, s. 2026, LGUs should issue the electrical permit within 3 working days and the CFEI within 7 working days, without extra requirements. (Department of the Interior and Local Government Region IV-A)
Good to know
- The page has no date and does not give processing times.
- NORECO II's page asks for a notarized Net Metering Agreement. The ERC's 22 September 2025 advisory says notarization is not mandatory and e-signatures are allowed. It also limits required documents to an application form, the CFEI, the amended agreement and the COC fee. Ask NORECO II which items are still required.
Contact NORECO II
(035) 225-7072 local 101; hotline 09173224237 / 09088641681; ogmnor2@gmail.com; NORECO II Building, Real St., Dumaguete City.
NORECO II net metering FAQs
How much does net metering cost at NORECO II?
How long does NORECO II take to process net metering?
What documents does NORECO II ask for?
Sources
- Net Metering — Negros Oriental II Electric Cooperative (accessed October 27, 2026)
- NORECO II homepage — Negros Oriental II Electric Cooperative (accessed October 27, 2026)
- Advisory to On-Grid Distribution Utilities in Compliance with the Net-Metering Program (22 September 2025) — Energy Regulatory Commission (copy hosted by BATELEC II) (accessed October 27, 2026)