Key takeaways

  • Choose an inverter aircon with a published power range. The TCL TAC-09CSD/FBI 1HP split is rated 660 W, with a range of 220 to 1,100 W on TCL's spec sheet.
  • Battery: 8 hours at an example average of 330 W, plus 10% losses, is about 2.9 kWh a night. An EcoFlow DELTA Pro 3 (4,096 Wh) covers that example; a DELTA 3 Plus (1,024 Wh) lasts about 2.8 hours.
  • Inverter: its continuous rating must cover the aircon's maximum draw plus everything else running. The DELTA Pro 3 is rated 4,000 W (8,000 W surge); PowMr's 6.5kW hybrid is 6,500 W with 2× surge for 5 seconds.
  • Solar: a DELTA Pro 3 with 6 × EcoFlow 220W in series (High-PV) and 1 × EcoFlow 400W (Low-PV) has 1,760 W of panels, about 5.6 kWh a day on example assumptions.
  • Plan a backup for rainy weeks, such as a generator or grid charging, and use a licensed electrician for anything wired into the house or mounted on the roof.
On this page
  1. Why off-grid cooling is harder than it looks
  2. Step 1: Choose the aircon first
  3. Step 2: Build a daily energy budget
  4. Step 3: Size the battery
  5. Step 4: Check the inverter and surge
  6. Step 5: Size the panels to refill the battery
  7. Step 6: Plan for rainy weeks and typhoons
  8. Step 7: Installation and safety
  9. What to buy: checklist
  10. Bottom line

To run an aircon off-grid at a farm, beach house or remote home, you need four things sized together: an efficient inverter aircon with a published power range, a battery big enough for your cooling hours (about 2.9 kWh for one 1HP unit overnight on our example assumptions), an inverter that covers the aircon’s maximum draw with headroom, and enough panels to refill the battery every day, plus a backup charging source for rainy weeks. Two verified routes are an EcoFlow DELTA Pro 3 (4,096 Wh, 4,000 W AC) with EcoFlow panels, or a PowMr 6.5kW 48V hybrid inverter with a battery bank designed by a licensed installer.

This guide walks through each part with real numbers, so you can see what an off-grid aircon actually takes before you spend anything.

Why off-grid cooling is harder than it looks

In a grid-connected home, the grid quietly fills every gap: cloudy afternoons, hot nights, the moment a compressor starts. Off-grid, there is no gap-filler. Every kWh your aircon uses must be:

  1. Produced by your panels during daylight,
  2. Stored in a battery (with some loss), and
  3. Delivered through an inverter that can handle the aircon’s peak draw.

An aircon is usually the largest load in a Filipino home, and in a bedroom it runs mostly at night, when the panels produce nothing. That’s why off-grid aircon setups are battery-heavy. If you’re still deciding between system types, read on-grid vs hybrid vs off-grid solar first.

Step 1: Choose the aircon first

The aircon sets the size of everything else, so pick it before the solar.

Use an inverter aircon. A fixed-speed (non-inverter) unit runs its compressor at full power whenever it’s on, then stops and restarts under load. An inverter unit slows down once the room is cool, so its average draw is lower. That reduces battery size and makes the inverter’s job easier. Beware of “inverter grade” or “inverter class” wording on fixed-speed units: Astron, for example, says its “Inverter Class” refers to its R-32 refrigerant, not an inverter compressor. Our guide to solar aircon myths and marketing claims covers these traps.

Prefer a model with a published power range. For off-grid sizing, you need to know both the rated input (for energy) and the maximum input (for the inverter). These verified models publish both:

Aircon Type Rated input Published range Source
TCL TAC-09CSD/FBI 1HP split 660 W 220–1,100 W TCL spec sheet
Kolin KA-100GQAIINV32 1HP window 740 W 148–888 W DOE label (rated); Anson’s (range)
Kolin KAG-75WCINV 0.75HP window 725 W 220–900 W DOE label (rated); listing (range)
TCL TAC-09CWI/UB2 1HP window 850 W 200–1,450 W DOE label (rated); Anson’s (range)
Kolin KA-150GQAIINV32 1.5HP window 1,010 W 202–1,212 W DOE label (rated); Anson’s/Lazada (range)

The TCL TAC-11CSD/P7 1HP split has the lowest rated input of the 1HP models we’ve verified (650 W, CSPF 7.11), which is excellent for battery size, but we haven’t found a published maximum input for it. If you choose it, ask TCL for the maximum input before sizing your inverter.

Size the aircon to the room, not bigger. A 1HP unit in a room that needs 1HP will settle down to low power. A 1.5HP unit in the same room costs more battery and inverter capacity for no extra comfort. Our aircon electricity consumption guide explains sizing.

Step 2: Build a daily energy budget

Write down every load and how long it runs. For the aircon, the honest approach is to work out a realistic figure and a worst case.

We’ll use the TCL TAC-09CSD/FBI 1HP (660 W rated) for 8 hours a night as the example.

Example assumptions. An inverter aircon often averages well below its rated input once the room is cool. The DOE label formula for inverter units uses a factor of 0.5, so we use an average of 50% of rated (330 W) as the example. We add 10% for inverter and battery losses. These are assumptions to show the method, not measurements. A hot, west-facing or poorly sealed room can run near full power all night.

Realistic example:  330 W × 8 h = 2,640 Wh, + 10% losses ≈ 2,900 Wh (2.9 kWh)
Worst case:         660 W × 8 h = 5,280 Wh, + 10% losses ≈ 5,800 Wh (5.8 kWh)

Now add everything else: lights, fans, a refrigerator, a water pump, phone charging, Wi-Fi or a satellite dish. Use each appliance’s label watts and your hours. The power station runtime calculator and our guide on how to calculate power station runtime help with this.

For the rest of this guide, assume (as an example) the other loads add 1.5 kWh a day and the aircon also runs 4 hours in the afternoon at the same 330 W average (about 1.45 kWh with losses). That gives a daily budget of about:

Night aircon 2.9 + afternoon aircon 1.45 + other loads 1.5 ≈ 5.9 kWh a day

Step 3: Size the battery

The battery must cover everything you use after the sun goes down, plus a reserve for cloudy mornings. In our example, the night aircon alone is about 2.9 kWh.

Route A: an EcoFlow power station

Power stations combine a lithium battery, an inverter and a solar charger in one box, and most are plug-and-play. Here’s how the larger EcoFlow models compare for one 1HP aircon, using the example 330 W average and 10% losses:

Power station Capacity AC continuous / surge Example hours at 330 W Expansion
EcoFlow DELTA 3 Plus 1,024 Wh 1,800 W / 3,600 W about 2.8 h Up to 5 kWh with extra batteries
EcoFlow DELTA 3 Max Plus 2,048 Wh 3,000 W / 6,000 W about 5.6 h EcoFlow PH says the expansion adapter isn’t available in the Philippines
EcoFlow DELTA Pro 3,600 Wh 3,600 W / 7,200 W about 9.8 h 10.8 kWh with two DELTA Pro Smart Extra Batteries
EcoFlow DELTA Pro 3 4,096 Wh 4,000 W / 8,000 W about 11.2 h About 12 kWh (EcoFlow’s figure) with up to two Smart Extra Batteries

Example hours = capacity × 0.9 ÷ 330 W. They’re estimates, not EcoFlow claims.

For an off-grid house that needs the aircon every night, the DELTA Pro 3 is the most practical of these. It covers our 2.9 kWh realistic night with room to spare, and one DELTA Pro 3 Smart Extra Battery (4,096 Wh each) doubles that, which also covers the 5.8 kWh worst case. The DELTA 3 Plus is a good brownout backup for a grid-connected home, but it’s too small to cool a bedroom through the night off-grid. See our DELTA Pro 3 buyer guide and run your own numbers in the EcoFlow runtime calculator.

Route B: a hybrid inverter with a battery bank

A PowMr 6.5kW hybrid inverter (48 V battery) or PowMr 4.5kW hybrid inverter (24 V battery) lets you build a bigger, fixed system with a separate battery bank. Battery capacity in Wh is the nominal voltage × amp-hours printed on the battery’s label. Choose the battery with your installer; we haven’t verified a specific battery for these inverters. Check that its voltage, maximum charge current and maximum discharge current match the inverter settings. Our guide to LiFePO4 batteries for DIY solar explains what to look for.

One off-grid detail people miss is idle draw. PowMr’s catalogue lists no-load consumption of under 50 W for the 6.5kW and under 35 W for the 4.5kW. Left on all day, that’s up to 1.2 kWh and 0.84 kWh a day respectively, before any appliance runs. Add it to your budget.

Step 4: Check the inverter and surge

The battery decides how long the aircon runs. The inverter decides whether it runs at all.

The rule: the inverter’s continuous rating must cover the aircon’s maximum input plus everything else that might run at the same time. Don’t use the rated input here; an inverter aircon can draw well above it while it pulls a hot room down.

Aircon Maximum input (published) Fits DELTA 3 Plus (1,800 W)? Fits DELTA Pro 3 (4,000 W)?
Kolin KA-100GQAIINV32 1HP 888 W Yes, about 900 W left for other loads Yes
TCL TAC-09CSD/FBI 1HP 1,100 W Yes, about 700 W left Yes
Kolin KA-150GQAIINV32 1.5HP 1,212 W Yes, about 590 W left Yes
TCL TAC-09CWI/UB2 1HP 1,450 W Only about 350 W left; tight Yes

Starting current isn’t published for any aircon we’ve verified. Kolin’s listings mention “Soft Start Up”, but that’s a listing claim. Inverter aircons generally start gently, which is another reason to choose one, but keep headroom anyway. The DELTA Pro 3 lists an 8,000 W surge rating, and PowMr’s catalogue gives its hybrids a surge of 2× rated power for 5 seconds.

If you’re tempted to run two aircons, the maths changes a lot. See running two aircons on solar.

Step 5: Size the panels to refill the battery

Panels must replace what you used overnight and power daytime loads. Our example budget is about 5.9 kWh a day.

Example assumptions. Daily output ≈ panel watts × 4 peak sun hours × 0.8 efficiency. Real output depends on your site, the season and the weather; see why a solar panel gives less than its rated watts.

EcoFlow DELTA Pro 3: verified panel setup

The DELTA Pro 3 has two solar inputs that can work at once: a High-PV port (30–150 V, 15 A, 1,600 W) and a Low-PV port (11–60 V, 20 A, 1,000 W), 2,600 W in total. These configurations are on our verified compatibility list:

Port Panels Wiring Panel watts Notes
High-PV 6 × EcoFlow 220W portable Series 1,320 W Voc 129 V. The manual specifies EcoFlow’s “Solar to XT60 Charging cable” for this port; EcoFlow doesn’t say whether the panel’s included Solar-to-XT60i cable fits, so get the XT60 version.
Low-PV 1 × EcoFlow 400W portable Single 400 W Built-in XT60 cable plugs straight in.
Low-PV (alternative) 2 × EcoFlow 220W portable Series 440 W Uses the panels’ included MC4-to-XT60i cable.
Low-PV (largest) 6 × EcoFlow 125W bifacial Parallel 750 W Daisy-chain through their own leads. Standard current 19.2 A is within the 20 A limit, but bifacial (back-side) current of 20.4 A can exceed it.

With 6 × 220W on High-PV and 1 × 400W on Low-PV, you have 1,760 W of panels:

1,760 W × 4 h × 0.8 ≈ 5.6 kWh a day (example)

That’s just short of our 5.9 kWh example budget on a good day. Using the 6 × 125W bifacial option on Low-PV instead raises the total to 2,070 W, about 6.6 kWh a day on the same assumptions. In practice, you’d trim afternoon aircon hours, or accept that the battery runs down over a few days and top it up from your backup source. Our DELTA Pro 3 solar panel guide and High-PV vs Low-PV explainer cover the wiring in detail.

For comparison, the original DELTA Pro takes up to 1,600 W on one 11–150 V port. 6 × EcoFlow 220W in series (1,320 W, Voc 129 V) is a verified configuration, about 4.2 kWh a day on the same example assumptions. See our DELTA Pro solar guide.

PowMr hybrid: verified string limits

The PowMr hybrids have a 55–450 V MPPT range and accept up to 6,500 W (6.5kW) or 6,000 W (4.5kW) of panels. From our compatibility checks, the PowMr 150W flexible panel (Voc 21.6 V) needs at least 4 in series to reach the 55 V minimum and no more than 18 in series to stay under our 405 V safety margin.

  • Example: 12 × PowMr 150W in series = 1,800 W, Voc 259.2 V. About 5.8 kWh a day on our example assumptions.
  • Two strings in parallel (for example 2 × 12 panels, 3,600 W) are allowed by the wattage limit, but PowMr doesn’t publish the maximum PV input current. Have your installer confirm it against the nameplate before paralleling.

Set the inverter to 60 Hz during commissioning, since that’s what Philippine appliances use. Our PowMr hybrid inverter guide has the full string tables. Most permanent rooftop systems use larger panels; ask your installer for their datasheet and the same voltage checks.

Step 6: Plan for rainy weeks and typhoons

This is where most off-grid aircon plans fail. During the rainy season, solar output can stay low for days. Your options:

  • A second charging source. A generator, or the grid where the property has a connection, can recharge the battery. The DELTA Pro 3 accepts AC charging (EcoFlow lists 2,900 W maximum AC input), and the PowMr hybrids have a 230 V AC input with 50/60 Hz auto-detection and utility charging. Ask your installer whether your generator’s output suits the inverter. Our comparison of solar generators vs gas generators explains the trade-offs.
  • Cut cooling first. On cloudy days, run the aircon for fewer hours, raise the setpoint, and use fans, which draw far less power.
  • Charge whenever there’s sun. Even a weak morning helps; see charging a power station on cloudy and rainy days.
  • Protect the gear. Portable panels should be packed away before a storm; see our typhoon prep guide for solar panels and power stations.

Step 7: Installation and safety

A power station with portable panels is plug-and-play: the owner can set it up by following the manual, and the aircon plugs into the station’s AC outlet. Check that the aircon’s plug and current suit the outlet.

Anything wired into the house, a breaker panel or the roof is different. Under RA 7920, electrical plans must be prepared or supervised, signed and sealed by a professional electrical engineer (PEE), a permit secured first, and the work done under licensed supervision. That covers a PowMr hybrid system, fixed rooftop panels, and a power station connected to house circuits through a transfer switch. Off-grid doesn’t mean permit-free: get an LGU electrical permit. Our guide to whether DIY solar is legal in the Philippines explains what you can and can’t do yourself.

What to buy: checklist

The aircon (pick one):

Route A, EcoFlow (plug-and-play):

Route B, hybrid inverter (installed by a licensed PEE or electrician):

  • PowMr 6.5kW 48V hybrid inverter: Lazada (PowMr), or the PowMr 4.5kW 24V for a smaller system
  • Panels with verified string limits, such as the PowMr 150W flexible, or larger panels your installer has checked against the datasheet
  • A LiFePO4 battery bank matched to the inverter’s voltage and currents, chosen with your installer
  • A backup charging source for rainy weeks

Bottom line

Off-grid aircon is possible, but it’s a battery project first and a solar project second. Pick an efficient inverter aircon with a published power range, budget its kWh honestly (about 2.9 kWh a night for one 1HP unit on our example, up to 5.8 kWh in the worst case), choose an inverter with clear headroom over its maximum draw, and size the panels to refill the battery with a backup plan for rainy weeks. An EcoFlow DELTA Pro 3 with 1,760 W of EcoFlow panels can carry one 1HP inverter aircon through a night on these assumptions. For a larger, permanent home, a PowMr hybrid with a properly designed battery bank, installed by a licensed professional, gives you more room to grow.

Run your own numbers

Frequently asked questions

Can I run an aircon off-grid with solar panels only, no battery?
Only during strong sun, and not reliably. Panel output rises and falls with clouds, while an aircon needs steady power. Without a battery, it would stop at sunset and whenever a cloud passes. A battery or power station is what makes off-grid cooling usable.
How big a battery do I need to run a 1HP inverter aircon all night off-grid?
On our example assumptions, about 2.9 kWh for 8 hours (a 660 W-rated unit averaging 330 W, plus 10% losses). In a hot, poorly insulated room it can run near full power, which would need up to about 5.8 kWh. Plan for the high side if you can.
Can a non-inverter aircon run off-grid?
It's a poor choice. A fixed-speed compressor runs at full power whenever it's on and restarts under load every cycle. None of the labels or spec sheets we checked publish its starting current, so you can't size the inverter's surge with confidence. Use an inverter aircon with a published power range.
What happens on rainy days in an off-grid aircon setup?
Solar output can fall sharply for days. Plan a second charging source, such as a generator or the grid where available, cut aircon hours on cloudy days, and use fans. Don't size an off-grid aircon on sunny-day output alone.

Sources

We link to primary sources wherever possible. Rates, rules and prices change — check the latest version with the publisher.

  1. FreshIN II FBI Series split type inverter spec sheet graphic (opens in a new tab) — TCL (image in TCL official Lazada store gallery)
  2. TCL TAC-11CSD/P7 energy label image (CN ACU-0049-002643) (opens in a new tab) — Lazada / TCL official store (reproducing DOE label)
  3. Kolin KA-100GQAIINV32 1.0HP AI inverter window (Ansons) (opens in a new tab) — Anson's
  4. Kolin KAG-75WCINV energy label and listing (opens in a new tab) — Lazada / Kolin store
  5. EcoFlow DELTA Pro 3 (PH store) (opens in a new tab) — EcoFlow Philippines
  6. EcoFlow DELTA Pro 3 user manual (opens in a new tab) — EcoFlow
  7. EcoFlow DELTA Pro (PH store) (opens in a new tab) — EcoFlow Philippines
  8. EcoFlow DELTA 3 Plus (PH store) (opens in a new tab) — EcoFlow Philippines
  9. EcoFlow NextGen 220W Portable Solar Panel user manual (opens in a new tab) — EcoFlow
  10. 2024 PowMr Solar Product Catalogue (EN) (opens in a new tab) — PowMr